- Estimated capacity / month
- 2.2B
- CP value
- 27.1
Read the limits in order
Read the windows before the model table
Token capacity in each model row is a conversion. What you can actually use is first shaped by these three windows and the plan allowance.
- 01 $12
Rolling 5 hours
A rolling five-hour window; concentrated usage can reach this ceiling first.
- 02 $30
Rolling week
A rolling weekly window with its own ceiling; concentrated usage may reach it before the monthly allowance.
- 03 $60
Monthly plan limit
The plan monthly ceiling; each model’s usage-equivalent follows its own reference row.
- Model options
- 28
- Free models
- 0
02Complete model index
Every model, in one working table
All 28 options are listed here. Search, calculate the same workload, or open a model detail page.
Higher CP means more Coding score for the same cost.
| Select | Next | ||||
|---|---|---|---|---|---|
| 2.2B | 27.1 | 72.2 | Calculate ↗ | ||
| 2.2B | 28.6 | 76.3 | Calculate ↗ | ||
| 1.6B | 15.2 | 56.8 | Calculate ↗ | ||
| 952.4M | — | — | Calculate ↗ | ||
| 672.9M | 6.6 | 58.8 | Calculate ↗ | ||
| 461.5M | 3.5 | 45.3 | Calculate ↗ | ||
| 461.5M | — | — | Calculate ↗ | ||
| 378.9M | 8.7 | 69.1 | Calculate ↗ | ||
| 342.9M | — | — | Calculate ↗ | ||
| 342.9M | 3.0 | 52.6 | Calculate ↗ | ||
| 342.9M | 3.3 | 58.6 | Calculate ↗ | ||
| 300.0M | 2.8 | 55.9 | Calculate ↗ | ||
| 189.5M | 8.2 | 65.0 | Calculate ↗ | ||
| 189.5M | 9.0 | 71.5 | Calculate ↗ | ||
| 180.0M | 1.6 | 54.5 | Calculate ↗ | ||
| 134.2M | 5.4 | 60.2 | Calculate ↗ | ||
| 112.5M | 5.4 | 71.4 | Calculate ↗ | ||
| 109.9M | 1.1 | 61.8 | Calculate ↗ | ||
| 105.1M | 1.1 | 60.8 | Calculate ↗ | ||
| 95.9M | — | — | Calculate ↗ | ||
| 85.7M | 0.8 | 55.8 | Calculate ↗ | ||
| 85.7M | 1.0 | 68.8 | Calculate ↗ | ||
| 62.9M | 2.9 | 68.8 | Calculate ↗ | ||
| 24.0M | 0.5 | 66.0 | Calculate ↗ | ||
| 21.4M | 1.1 | 74.8 | Calculate ↗ | ||
| 17.1M | 0.8 | 71.8 | Calculate ↗ | ||
| 13.8M | 0.7 | 76.8 | Calculate ↗ | ||
| 8.6M | 0.4 | 76.2 | Calculate ↗ |
- Estimated capacity / month
- 2.2B
- CP value
- 28.6
- Estimated capacity / month
- 1.6B
- CP value
- 15.2
- Estimated capacity / month
- 952.4M
- CP value
- —
- Estimated capacity / month
- 672.9M
- CP value
- 6.6
- Estimated capacity / month
- 461.5M
- CP value
- 3.5
04Billing conditions
Conditions to read with the plan limits
These conditions affect plan choice and usage estimates.
- 01
How model allowances and shared plan pools work
Command Code GOAT uses one shared credit pool; OpenCode Go lists a usage equivalent for each model. Model allowances cannot be added together as plan capacity.
- 02
Per-request usage changes the available count
The reference request is an estimate basis. Five-hour and weekly windows limit concentrated use; Command Code GOAT rolls its window from the first request.
- 03
Peak windows and context tiers change the cost
DeepSeek has UTC peak pricing, and some OpenCode models switch to another price set above a context threshold. The reference profile sits in ordinary short context and does not blend every context branch into one number.
- 04
Included capacity and purchased credits
Command pay-as-you-go credits are not bound by the windows, and OpenCode's Use balance may fall back to Zen balance after the Go limits. Both are listed separately from included capacity.
- 05
Model lists and prices are updated
Official documentation can change its model list or prices. This page shows the current data date; comparable later snapshots will be listed in the update history.